Method for using manual hydraulic clamp-hydraulic tools

1, first check the pressure terminal and wire specifications are matched;
2, select the pressure to die, for example, to be pressed terminal specifications 240mm2, select the upper and lower mold 240mm2;




3, the mold into the piston and die fixed seat;
4, the use of methods: pump oil intake and return the switch clockwise to tighten repeatedly shaking the handle, watching when the upper and lower die mold, both in a touch when it said pressing is completed, if the user does not pay attention to shake, pump "Kacha" sound, this is the safety protection device is opened, the piston stops at this time, should be back to the oil switch to the counter clockwise rotation, the piston back to its original position.
YUHUAN SITUTE(SITOOT) TOOLS CO.,LTD.

Add:BinGang Industrial Zone,Yuhuan County,Taizhou City,Zhejiang Province,China
Tel:0086-576-87229709
Fax:0086-576-87296000
E-mail:sitoot@sitoot.com
         sitoot@126.com

Comments

Popular posts from this blog

Busbar Processor Mchine (DHY-150D)